|
Post by Ex_Nuke_Troop on Feb 9, 2014 7:45:50 GMT
Disfigured fuel assembly of reactor 4 poolFollowing up this article.. 3 cracks found in a channel box of reactor4 pool fuel / Tepco “since 1982″ → Cracks not even rusted On 1/30/2014, Tepco released 5 videos of their investigating the disfigured fuel assembly in SFP4. They state the assembly was damaged in 1982, not due to the recent fuel removing operation in the pool. fukushima-diary.com/2014/02/video-disfigured-fuel-assembly-of-reactor4-pool/
|
|