Fukushima Diary : [Deteriorating plant] Reactor 1 thermometer malfunctioned “due to the leaked rainwater” Posted by Mochizuki on April 8th, 2014
One of the thermometers in reactor1 malfunctioned due to the leaked rainwater, according to Tepco. It is assumed to take 40 years to decommission the crippled Fukushima plant. It’s been only 3 years but one of the most important sensors is already deteriorated seriously.
At 4 am of 4/4/2014, one of the thermometers in Reactor1 primary containment vessel suddenly indicated -20℃. It was indicating 17.2℃ before then.
On 4/7/2014, Tepco found a connecting part of the cable sank in water. The thermometer indicated the normal temperature when they took the connector out of the water.
Tepco’s spokesman announced the water was the leaked rainwater.
The reactor buildings turned out to be so deteriorated that rainwater leaks even to the inside of the facilities already.
"The release of atom power has changed everything except our way of thinking...the solution to this problem lies in the heart of mankind. If only I had known, I should have become a watchmaker."
- Albert Einstein
chev: Yall got it pretty well covered here, But I did want to recomend this greenroad blog...http://agreenroad.blogspot.co.nz/2013/12/plutonium-238-from-fukushima-traveled.html
Apr 14, 2014 14:41:56 GMT
Ex_Nuke_Troop: Look who just made The Wall of Shame ? Radchick AKA Christina Consolo : Rense Radio Network // Climate Viewer News
Apr 14, 2014 19:15:04 GMT
Ex_Nuke_Troop: Welcome Ginny ! I've not been posting much here lately, participation was so slow ...
Sept 20, 2014 4:22:22 GMT
Ex_Nuke_Troop: Ginny was a spammer and has been NUKED !
Sept 20, 2014 4:27:48 GMT
horse: Found site while catching up with Majia. So sorry, M, to hear of your cov2 problems. You are a bright light in a darkening world. "it's safe", Pharma lies like the nuke industry. Stayin' pureblooded. Alaska crabs disappear a year after Tritium tanks dump..
Oct 20, 2022 17:17:34 GMT