Post by Ex_Nuke_Troop on Mar 15, 2014 7:15:24 GMT
Pure water → drip on the desalination system floor → 800,000,000 Bq/m3 of All β / Equipment highly contaminatedPosted by Mochizuki on March 12th, 2014 Following up this article.. Contaminated water leaked from desalination system again / 23,000,000,000 Bq/m3 of All β nuclide detected On 3/12/2014, Tepco announced pure water turned to be highly contaminated water poured on the floor in Fukushima plant. On 3/9/2014, Tepco employee found contaminated water retaining in the water purifying system, which is to desalt the circulated coolant water. However because they couldn’t identify the leaking point, they assumed it was the dew condensation water. They poured pure water onto the floor for a test. As a result, they detected high level of contamination from the poured “pure” water. The densities are Cesium-134 : 390,000 Bq/m3 Cesium-137 : 960,000 Bq/m3 All β nuclides (to include Strontium-90) : 800,000,000 Bq/m3 Tepco states there is a possibility that highly radioactive plume is already attached to the floor. It is extremely difficult to decontaminate the desalination system, workers are forced to be exposed only to work in the place. It’s been 3 years since 311, but it is estimated to take more 40 years to decommission the plant. www.tepco.co.jp/nu/fukushima-np/handouts/2014/images/handouts_140312_04-j.pdfwww.tepco.co.jp/tepconews/library/movie-01j.htmlIori Mochizuki fukushima-diary.com/2014/03/pure-water-%E2%86%92-drip-on-the-desalination-system-floor-%E2%86%92-800000000-bqm3-of-all-%CE%B2-equipment-highly-contaminated/
|
|